We're in the process of having a house extension being built, no new circuits will be provided, on 1 existing ring main 3 extra sockets will be provided, on another existing ring 4 extra sockets & on the existing downstairs lighting 3 extra lights & switches.
I'm in disagreement with the building inspector, as although no new circuits are being provided it isn't notifiable work, yet he is still insisting that paperwork is provided for it & effectively threatening that his boss may not sign the build off if it's not provided.
Is he right, can he do this?
I'm in disagreement with the building inspector, as although no new circuits are being provided it isn't notifiable work, yet he is still insisting that paperwork is provided for it & effectively threatening that his boss may not sign the build off if it's not provided.
Is he right, can he do this?