Pip
-
Hi People,
Looked at a job today which requires adjustments to the CU and noticed there is 16mm from CU to MET which is cool, 10mm from MET to Gas main incoming, and bonding between all pipes coming in and out of the boiler linked off the GAS main bonding.
When I pointed out that there should be a 10mm to the mains water incoming the customer informed me that there was not one fitted as the incoming pipe is plastic, and most of the fittings in the house were a mixture of plastic and copper, so would be no use as an earth bond.
I could see his point, but where do we stand on such a situation?
Pip
Looked at a job today which requires adjustments to the CU and noticed there is 16mm from CU to MET which is cool, 10mm from MET to Gas main incoming, and bonding between all pipes coming in and out of the boiler linked off the GAS main bonding.
When I pointed out that there should be a 10mm to the mains water incoming the customer informed me that there was not one fitted as the incoming pipe is plastic, and most of the fittings in the house were a mixture of plastic and copper, so would be no use as an earth bond.
I could see his point, but where do we stand on such a situation?
Pip