Guys, help !!
My work collegue is a time served spark and somewhat slovernly in his work production. I am a bit of a sticker for producing neat safe work, I asked him to through crimp some flex and this is what he did, the whole effort was wrapped in tape together and not individually so the bare conductors were touching ( he went into the crimp by one end only and not 'through' the crimp as expected). It is only by chance I decided to check on this after he had left the work site for a while.
Gents this would have been the feed from a streetlight head down to the cut out in the base of an 5 meter pole. Replacing the entire length of flex was not an option because of access issues otherwise we would have done so.
My dilema is he often produces such work and infuriates me as I am having to constantly check his work or do it myself, increasing my work load at each job.
How do I deal with this ?
My work collegue is a time served spark and somewhat slovernly in his work production. I am a bit of a sticker for producing neat safe work, I asked him to through crimp some flex and this is what he did, the whole effort was wrapped in tape together and not individually so the bare conductors were touching ( he went into the crimp by one end only and not 'through' the crimp as expected). It is only by chance I decided to check on this after he had left the work site for a while.
Gents this would have been the feed from a streetlight head down to the cut out in the base of an 5 meter pole. Replacing the entire length of flex was not an option because of access issues otherwise we would have done so.
My dilema is he often produces such work and infuriates me as I am having to constantly check his work or do it myself, increasing my work load at each job.
How do I deal with this ?