A good point of course, but I am running out of time and options. But how hard can it be plugging 16 optimisers into the back of 16 panels and plugging them in one string into an inverter? OK, I was joking - that's why you are the experts and I am just the unfortunate punter! Is there any technical configuration to do in the inverter, or does it set itself up? I must say that having the Solar Edge transmitting data to the web is sounds interesting...
By the way, this was the Growatt Tech Support answer to my question "
Our 2 roofs face in the same direction but they do NOT have the same angle - the 12 panels would be at 30% to the horizontal, and the 4 panels would be at 35% to the horizontal. Can we still use the 3600MTL wired 8+8?""5% should not be that much that affect the overall performance. In some instances 4 panels may be able to produce more that the 4 others, but limit their power production to the low ones. I am assuming this will be a 8+8 config using a 3600MTL".
So if the extra for Solar Edge is too much, we just settle for the Growatt with 2 MPPTs wired 8 + 8, since that is the contract we have signed up to.
I just need to decide how much is too much... Answers on a postcard.