So I was thinking of investing in one of those lasers with a plumb bob after using a colleagues on a recent job - very helpful.
I’m now doing a job where I have to wire downlights where it’s a really high ceiling (so cables banded and hanging awaiting dropped pb ceiling)
I was thinking of marking the lights on the concrete floor, using plumb bob to give ceiling position and then drilling a shallow 5.5 hole into the floor exactly on the plumb line to use later at 2nd fix to cut holes out, using the plumb bob laser.
Anyone else done this? I’m a bit concerned the holes may get covered in dust etc, but it would save having to mark out twice!
I’m now doing a job where I have to wire downlights where it’s a really high ceiling (so cables banded and hanging awaiting dropped pb ceiling)
I was thinking of marking the lights on the concrete floor, using plumb bob to give ceiling position and then drilling a shallow 5.5 hole into the floor exactly on the plumb line to use later at 2nd fix to cut holes out, using the plumb bob laser.
Anyone else done this? I’m a bit concerned the holes may get covered in dust etc, but it would save having to mark out twice!