H
highspark
Doing a CU change in a flat, concrete floors and ceilings, just been decorated in hallways and bedrooms. Basically kitchen fitters ripped units out today and the bonding to the main gas has been cross bonded to the water behind units. Water is bonded back to the MET. However incoming water is bonded in a cupboard next to CU (nowhere near kitchen). There is absolutely no way I can get 10mm bonding back to the board without smashing hell out of the place!
Do I need to get this back to the MET or can I note on cert it's cross bonded! Absolute nightmate!
Do I need to get this back to the MET or can I note on cert it's cross bonded! Absolute nightmate!