Initial sequence | Page 3 | on ElectriciansForums

Discuss Initial sequence in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

This is all total bs. Ze by enquiry is nonsense given the amount of times if seen a TN system with a stupidly high Ze. Also a Zs is the only test that encompasses the complete circuit including protective devices which can have high impedances which all this calculating rubbish will not find. I though the point of testing was to prove the installation is safe for the users.
 
What is now deemed to be essential H&S really boils my wee. How come properly trained (or supposedly properly trained) electricians are now not skilled enough to carry out a live test or two without endangering themselves or other people?
Like most I was taught how to do these things and many others that would now curl the hair of an on site H&S bod. I've worked live when there's been no other option, I've done so after carrying out my own risk assessment and putting a method statement in my own head. I've never needed someone with a clipboard and no electrical knowledge to stand behind me telling me what I'm doing is either right or wrong.
The entire world is going to hell in a handcart

my method statement is quite simple, lock the doors with key in lock/use other deterants to keep them occupied.

last resort is a lookout to sing/whistle along with song when he spots anyone around
 
I am not disagreeing with you, i am just telling you how it is. Read and understand the EAWR. The problem with the people who write all this legislation etc, consider ALL of us to be thick Electricians, and so try to minimise danger and if we go against the law and it goes pear shaped then we cop for it.

So please don't shoot the messenger.

Cheers............Howard

Are you sure the live EAWR working rules rules apply to testing procedures??

All this load of old crap about live working, doesn't apply to electrical testing, if it did, we all might as well pack our bags and call it a day!! Live tests are an essential necessity full stop, no matter what these half wits have to say... I suppose next, they'll be telling you, voltage testers cannot be used to test /check voltages above 50 Volts, or that you can't test/check phase rotation, ....and so on and so on!!

Hmm, ...Just a thought, so what does EAWR state about voltage testing and phasing out testing on live MV/HV systems, or is that against EAWR too?? lol!!!

Jesus the UK has got to be fast becoming the laughing stock of Europe, if not the world...
 
I'm not sure what Howard is referring to within EAWR.
From memory, it only states that Live Working should be avoided if at all possible.
I'm not checking at this hour!
 
IIRC, which I might not, when I was doing the 2391 we were told working live should be avoided unless absolutely necessary, so therefore if it can be calculated.....

I knew it was nonsense then and I know it is nonsense now.
My theory was... do as you are told pass the exam and when in the real world do it properly.

This is one of the main areas where Short courses and college only routes let down trainees.

Obviously a respect for those pesky little electrons is healthy.
In the real world we need to work live from time to time so being able to do it safely is of the utmost importance.
 
If it is that the wording has been there since when? and why now is it being interpreted in this way?

The culture should be minimize risk wherever possible, no point in earning money if you dont get to go home at the end of day.

After all DNO personnel around here when changing heads are only allowed one exposed conductor, and when doing joints with shear offs they have no exposed conductors. They have gone that way our industry is probably looking that way...

BUT, this measurement is essential if the safety of the installation is to be assessed and to some extent the users of that installation. The measurement can usually be taken from a position of relative safety ie in a fuseboard with internal guards with equipment to GS38 with competent personnel, live parts are only really accessible with a tool rather than a finger or a face! Sometimes standing on a rubber mat haha. I cant see too many problems in that case, after all the designer of the installation would have worked to a quoted PFC from the DNO this would have to be verified.
 
Lack of experience , knowledge is going to notch up a higher body count, for people who haven't been taught how to do this safely

As we all know life is full of risks the people with the least experience will be the most at risk

If the trainees aren't intelligent enough to take in this information and use it as countless others have , before them,
then the training centres need to take a better look at the candidates rather than making the training fit the candidate
In my opinion the most dangerous electricians I've met are always the ones I wonder how they were accepted onto a course/apprenticeship
 

Reply to Initial sequence in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
299
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
810
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
857

Similar threads

The actual listed observations seem easily resolvable, comfortably less than a day's work. The picture of the supply poses a few questions...
Replies
5
Views
1K
Good thinking - the other side of that is my garage and also where the gas comes in so probably quite a tidy solution if it comes to it!
2
Replies
22
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top