I've recently carried out a full rewire of a domestic property which had a supply to a garage by use of an armoured in ducting run underground. I have taken a new feed to the adaptable box that said armoured is terminated into and have tested the armoured itself and all is ok. My question is, as the garage has its own CCU that is supplied by the armoured would I have to test the power & lighting circuits in the garage to put on a separate schedule of test results as part of the overall certificate or is it sufficient enough to test the r1+r2 & loop of the supply to the CCU and record the results on the schedule of results for the CCU in the property