M
miner69er
Hello guys and maybe the odd gal..
i'm after a bit of advice. there is an 'A' frame roof thats about to have the suspended ceiling put up and i have to put the drops in ready for the lights. What is the normal practice in dropping the cables (approx 1.2 to 2m) from the rafters down to sus. ceiling height? Am i being over the top in thinking of using cable tray screwed down from the rafters so i can tie wrap the cables to it?
Any sane and sensible advice gratefully recieved.
i'm after a bit of advice. there is an 'A' frame roof thats about to have the suspended ceiling put up and i have to put the drops in ready for the lights. What is the normal practice in dropping the cables (approx 1.2 to 2m) from the rafters down to sus. ceiling height? Am i being over the top in thinking of using cable tray screwed down from the rafters so i can tie wrap the cables to it?
Any sane and sensible advice gratefully recieved.