Hope somebody can help
I am a time served sparks and a PV installer with all the relevant qualification.
I have installed around 250 PV systems and signed them off as I m NICEIC registered.
The MCS was dealt with through the companies I was installing for.
So here is the question-
As the FIT is so low can you install PV under 3.68 Kw and not apply for the FIT without being MCS accredited.
Thanks in advance