Our electrician has billed us for 187 hours to start 1st fix on 2 x bedrooms and 2x en-suites. He hasn’t completed 1st fix fully yet. He’s also put in 3 x double sockets and 2x cat 6 cables in other bedrooms.

Is this a reasonable amount of hours v work?

Mainly the work is just bedroom switches x 4, 3 x spot lights in 1 x en-suite, fuse spurs x 2 for UFH and UFH mains supply.

It seems a lot of hours v the work.
 
4 weeks of full time work seems a lot for what you have said is done.
I would ask for an explanation from your electrician.
 
As James said, that’s not a lot of work (at face value) for a large fee. However, what you don’t post is what else may(not) have been involved to achieve that work - if the building is C15th with 18’ thick stone walls then it’s an entirely matter than a 70’s estate house and some stud wall. But yes, that does seem worthy of justification.
 
As James said, that’s not a lot of work (at face value) for a large fee. However, what you don’t post is what else may(not) have been involved to achieve that work - if the building is C15th with 18’ thick stone walls then it’s an entirely matter than a 70’s estate house and some stud wall. But yes, that does seem worthy of justification.
Hi - thanks for posting.

The house is a 1930's house with the majority of work being required in a newly built extension.

The house was vacant at the time and effectively a building site.
 
Our electrician has billed us for 187 hours to start 1st fix on 2 x bedrooms and 2x en-suites. He hasn’t completed 1st fix fully yet. He’s also put in 3 x double sockets and 2x cat 6 cables in other bedrooms.

Is this a reasonable amount of hours v work?

Mainly the work is just bedroom switches x 4, 3 x spot lights in 1 x en-suite, fuse spurs x 2 for UFH and UFH mains supply.

It seems a lot of hours v the work.
Did you not agree a price prior for the complete job? Usually you would expect a price with caveats that additions to anything initially agreed would be discussed, agreed on, and charged extra accordingly.

On face value it does seem excessive but, in the electricians defence without full details its difficult for us to make judgement.
 
Did you not agree a price prior for the complete job? Usually you would expect a price with caveats that additions to anything initially agreed would be discussed, agreed on, and charged extra accordingly.

On face value it does seem excessive but, in the electricians defence without full details its difficult for us to make judgement.
Yes there was a price in place for sure. Electric plan changed and he said he needed to revise. He carried on working and then doubled the quote, submitting an interim invoice for some £6,000 + the £2,000 we paid already. Bear in mind that the work he was doing was just two bedrooms 1st fixing sockets and light switches in stud work. On top of this is £1500 in materials - hope this helps
 
There could be the argument that he carried on working under the original price.

If there was a revision of price, he should have submitted that and agreed with you before commencing.

Not always possible when there are time constraints to consider.
 
Yes there was a price in place for sure. Electric plan changed and he said he needed to revise. He carried on working and then doubled the quote, submitting an interim invoice for some £6,000 + the £2,000 we paid already. Bear in mind that the work he was doing was just two bedrooms 1st fixing sockets and light switches in stud work. On top of this is £1500 in materials - hope this helps
Who changed and to what extent the plan and what was the sequence of events?

Based on what you have stated (though there still isn't enough detail to make a proper judgement) It does seem very excessive. There seems to have been a lack of communication from both parties involved.

Have you asked the electrician to breakdown their invoice explaining how the additional cost has been generated? Did you agree for the electrician to proceed to the new plan before the new cost was agreed?
 
  • Like
Reactions: DPG

Reply to Is 187 hours of work reasonable? in the DIY Electrical Advice area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
378
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
947
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

The challenge that you have with this is that you've no confirmed start point. Because you have a lack of an EICR you don't actually know what...
Replies
7
Views
603
Thanks all for your comments, advice and suggestions. The following is probably pretty boring for most, and is simply a summary of how the job...
Replies
8
Views
875

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top