I just wanted to check with more experienced guys on the requirement for an isolation switch. I have been asked to replace a CCU and I had a quick look at the job before doing all the pre testing that is needed. There is no Isolation Switch or Henley Block, just the 16mm old colour tails coming out of an old style rotary meter. The providers seal is still on the incoming fuse.
What is the best way to proceed? Do I need to get the provider or DNO to install an isolation switch and henley block or is there another way of doing it?
Many thanks.
What is the best way to proceed? Do I need to get the provider or DNO to install an isolation switch and henley block or is there another way of doing it?
Many thanks.