Hi folks. Quoted a little job yesterday and customer wasn't happy with quote so just want to see what you all think, I'd hate to think I'm becoming over priced so need some honest opinions on this quote.
In the customers utility she has one surface mounted single socket. She wanted that changing to a double. She wanted a new double socket adding further down the utility which I planned to extend the ring for. Then she wanted an outside light spurred off the ring which I obviously would need to add a fcu as a minimum but would've probably put a switch in too. All the above would've been surface mounted in yt2.
The customer was providing the outside light, I was providing everything else.
I quoted ÂŁ150 for materials and labour and the customer said she was expecting more around the ÂŁ100 mark. What do you all think? Really keen for some opinions on this whether they're for or against my quote. Cheers
In the customers utility she has one surface mounted single socket. She wanted that changing to a double. She wanted a new double socket adding further down the utility which I planned to extend the ring for. Then she wanted an outside light spurred off the ring which I obviously would need to add a fcu as a minimum but would've probably put a switch in too. All the above would've been surface mounted in yt2.
The customer was providing the outside light, I was providing everything else.
I quoted ÂŁ150 for materials and labour and the customer said she was expecting more around the ÂŁ100 mark. What do you all think? Really keen for some opinions on this whether they're for or against my quote. Cheers