Just finished a rewire...... exhausted! | Page 2 | on ElectriciansForums

Discuss Just finished a rewire...... exhausted! in the UK Electrical Forum area at ElectriciansForums.net

HappyHippyDad

-
Esteemed
Arms
Supporter
Joined
Dec 18, 2011
Messages
5,295
Reaction score
6,533
Location
Gloucestershire
Just spent 2 weeks rewiring a 3 bed house, I made it ÂŁ500 cheaper to encourage the owners to move out which they did, thank goodness.... lived in rewires are a nightmare.

I finished the first fix a few days ago and the plasterer filled in all the chases as I was certain all was fine :D.

I then started my dead tests, got to the top landing and couldn't quite understand why the top landing switch only had a twin and earth going to it as it was 2 way with the first floor landing switch. Slowly, over a period of perhaps 5 or 6 seconds my heart dropped as I realised it was impossible to have a 2 way switch with only a twin and earth going to it, but I kept thinking.....there must be some way, of course there isn't, I just couldn't bear the thought of having to take all his plaster out and re-chase. I was exhausted. However, I did take his plaster out, floorboards back up, 3 core and E in, I was exhausted. Luckily the plasterer was fine about it and I am now having a beer having finished 2 weeks of hard work. :)

PS.. In the mild state of hysteria for the 5-6 seconds I (for a millisecond) considered using the earth as the link, tutt tutt, It shouldn't have even entered my head!
 
A full rewire on your own is seriously hard work, and to do the whole lot in 2 weeks is commendable. My son and me took a whole week recently to just first fix a large ish 3 bed bungalow but there's a lot in it including loads of downlights, 8 thermostats all wired for underfloor heating zones and all in blockwork, chased in over 60 metal wall boxes and used loads of 25 and 32mm capping, reminded me how much I hate that stuff. :)
 
I think I posted some pictures on here before of a Rewire of a oast house I done. They had a problem with cables being chewed etc so we done it all in Galv conduit and had floor boards on top of floor board in the opposite direction. Was an absolute nightmare.....IIRC it ended up being a 25k rewire for a 3 bed oast house o_O
 
Yes I've used 2.5 mm t&e instead of 3 core and also used twin red instead of black and red we all make mistakes it how we correct them that counts .. ps yes red and black . Not done any rewires for a while :)
 
It has taken me roughly 2 weeks to fully complete an occupied full rewire.
Empty house would probably look at smashing it out in just over a week on my tod.

As for pricing , standard 3 bedder all down lighters , chrome sockets etc looking at about ÂŁ14k these days...That includes all making good plastering etc.
 
Last edited:
I did one vacant rewire in my five year stint as a sparkie, on my lonesome in my semi retirement years.

Also took me two weeks, on & off. Nearly killed me. Caused a plantar fasciitis in me foot, which I still suffer with. The first floor lighting was the worst. Up & down from the loft hatch, 'cos the cable really kept jamming, nearly threw thing.

Never ever again.
 
I did one vacant rewire in my five year stint as a sparkie, on my lonesome in my semi retirement years.

Also took me two weeks, on & off. Nearly killed me. Caused a plantar fasciitis in me foot, which I still suffer with. The first floor lighting was the worst. Up & down from the loft hatch, 'cos the cable really kept jamming, nearly threw thing.

Never ever again.

This is why most people do full rewires as a 2 man team. One to pull / push the cable the other is to ensure it doesn’t catch or snag on things.
Yes it increases your labour cost but should reduce the time and agro
 
Just spent 2 weeks rewiring a 3 bed house, I made it ÂŁ500 cheaper to encourage the owners to move out which they did, thank goodness.... lived in rewires are a nightmare.

I finished the first fix a few days ago and the plasterer filled in all the chases as I was certain all was fine :D.

I then started my dead tests, got to the top landing and couldn't quite understand why the top landing switch only had a twin and earth going to it as it was 2 way with the first floor landing switch. Slowly, over a period of perhaps 5 or 6 seconds my heart dropped as I realised it was impossible to have a 2 way switch with only a twin and earth going to it, but I kept thinking.....there must be some way, of course there isn't, I just couldn't bear the thought of having to take all his plaster out and re-chase. I was exhausted. However, I did take his plaster out, floorboards back up, 3 core and E in, I was exhausted. Luckily the plasterer was fine about it and I am now having a beer having finished 2 weeks of hard work. :)

PS.. In the mild state of hysteria for the 5-6 seconds I (for a millisecond) considered using the earth as the link, tutt tutt, It shouldn't have even entered my head!
I would have upgraded them to Lightwave switches and gone to the pub
 
I've heard some sparks talking about rewires on their todd in a week before, usually turns out they are doing 15 hour days, so the reality is in man hours it's a lot more than a week.
I would say I did 2 x 7 hour days (as I was doing the school run), 5 x 9 hour days and 3 x 12 hour days. So if you class a day as 8 hours then my time works out to 11.875 working days.
20-30 min break for lunch and sometimes an extra 10 minute tea break.
The 12 hour days were the last 3 (Thursday/friday/saturday) when I realised I was going to have to work today as well unless I put in some extra work. Whereas now I get to sup a cup of tea.... whilst continuing to talk about the rewire!
The last 3 hours were packing up and giving the house a thorough sweep, hoover and mopping!
[automerge]1570355401[/automerge]
Did loads of rewires,its really hard work,& to be honest never really found it satisfying,money is always tight,& no way relevant to all the hard work you’ve put in,have a beer on me ?
I would say I find 95% of the jobs I do as an electrician satisfying. This rewire was perhaps too hard and I found myself stressed out too much of the time, but I still went home on some of the days feeling happy with what I had accomplished. Plus It does feel like an achievement now so that is a positive feeling :).

I have my 3 priorities (in order of importance) which I occasionally remind myself whilst working:

1. Do a good, safe job
2. Enjoy what you are doing.
3. Make some money.

I accomplished number 1, fell a little short at times on number 2 and accomplished number 3.
 
Last edited:
I would say I did 2 x 7 hour days (as I was doing the school run), 5 x 9 hour days and 3 x 12 hour days. So if you class a day as 8 hours then my time works out to 11.875 working days.
20-30 min break for lunch and sometimes an extra 10 minute tea break.
The 12 hour days were the last 3 (Thursday/friday/saturday) when I realised I was going to have to work today as well unless I put in some extra work. Whereas now I get to sup a cup of tea.... whilst continuing to talk about the rewire!
The last 3 hours were packing up and giving the house a thorough sweep, hoover and mopping!
[automerge]1570355401[/automerge]

I would say I find 95% of the jobs I do as an electrician satisfying. This rewire was perhaps too hard and I found myself stressed out too much of the time, but I still went home on some of the days feeling happy with what I had accomplished. Plus It does feel like an achievement now so that is a positive feeling :).

I have my 3 priorities (in order of importance) which I occasionally remind myself whilst working:

1. Do a good, safe job
2. Enjoy what you are doing.
3. Make some money.

I accomplished number 1, fell a little short at times on number 2 and accomplished number 3.
That’s the glory of self employment, all the hours are of your choosing, make em work for you, so long as you’ve earned what you need out of a job and the customers happy doesn’t matter how long it takes...

Ps.i do the school run as well and love the fact I can...
 
I wasn't knocking anyones work ethic with the above post, just saying that stated times in days/weeks to do jobs is misleading and can unjustly make some feel they are too slow. It is more realistic to give times in man-hours. A week of 16 hour days amounts to 2 weeks in the 8-5 world.
 
That’s the glory of self employment, all the hours are of your choosing, make em work for you, so long as you’ve earned what you need out of a job and the customers happy doesn’t matter how long it takes...

Ps.i do the school run as well and love the fact I can...
There is no point in being self deployed if you can't make the hours suit your lifestyle

Might as well go cards in if you want a 9-5

Completely agree, I may be knackered but it's my choice to be knackered. When I worked as a nurse I HAD to turn up on time, on set days and leave at set times, whilst being accountable to a line manager. Man the thought of that makes me cringe now. I feel free now! :) But knackered :D

In fact today (the Sunday when my boy isn't with me), would have been a 14 hour shift (as a nurse) working on a detox unit in a prison, 2 fingers up to that malarkey!!! I'll sup coffee and write to you lot instead :)
 

Reply to Just finished a rewire...... exhausted! in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
373
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
938
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

The challenge that you have with this is that you've no confirmed start point. Because you have a lack of an EICR you don't actually know what...
Replies
7
Views
597
  • Question
We just left it as it was, again the customer didn't seem too bothered, dont think she wanted me digging any further.
Replies
14
Views
2K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top