Hi guys, just priced a job and i think i may have priced to much?
Basically it is reconfiguring the original ring and adding extra points, points on view and cooker switch to be MK Brushed chrome about 3-4 sockets on view. Rest in white goods under counter etc. Cooker wire already in place and using existing. Having to add RCD enclosure to protect sockets as original board has no RCD and not one available. Circuits to be sheathed and buried.
There are also 7 spots to install and also need to add gas bonding and water as non there currently.
Then test and certify.
Estimated 2 days work and materials ÂŁ927
Cheers in advance.
Basically it is reconfiguring the original ring and adding extra points, points on view and cooker switch to be MK Brushed chrome about 3-4 sockets on view. Rest in white goods under counter etc. Cooker wire already in place and using existing. Having to add RCD enclosure to protect sockets as original board has no RCD and not one available. Circuits to be sheathed and buried.
There are also 7 spots to install and also need to add gas bonding and water as non there currently.
Then test and certify.
Estimated 2 days work and materials ÂŁ927