Potential job for one of my builders I have done a smaller previous job for
turning office into 7x 1/2bed flats but no gas.
Load in flats is:
20 odd led downlights (2x 6amp)
15 d.sockets (2x 32a)
1x induction hob (1x 32a)
1x fan oven (1x 20a)
1x 3kw immersion (1x 16a)
5x heaters- assume <13amp oiled filled (split on the 2x 32amp rings)
so a max demand of around 57amps
so 7x flats on 60a supply =420a + communal lighting
safe to say 120kva TPN new supply would suffice?
Cheers guys