Does anyone on here have experience or currently do any work for large house builders?

What kind of prices do they offer for new build work?

Me and my mate just smashed out three 3 bed houses in a week. And no it wasn’t a rough job, we are just fast workers and know how to get it done well (not blowing are own horns)

I’m sure I spoke to someone a while back to who said they get a day for pair to 1st fix and a day for a pair 2nd fix a 2/3 bed house....
 
would like to see some pics.......
Probably getting ripped off and have to “smash” the work out cos the LARGE builder is milking them and telling them fixed price per property which is poor rate sad to see we are meant to be cream of the crop and not let builders take advantage I’ve learnt from my mistakes in the past as I’m sure we all have
 
As Lee said, there are easier ways to make money.
I'm not saying that you're making it up but that sounds unrealistic unless like someone said, we aren't getting the full pictures.
 
Without getting drawn in to ‘how quick can you lash out a new build’...
1st fix basic spec house.
On your own you could probably chop all the boxes in one day and start drilling out joists. Day two finishing drilling the joist holes then start pulling cables. Day three full on cable pulling day. Day four finish off wiring and do all your capping and tidy up any odd bits.
Day five if necessary

?
Totally agree,same procedure I had,many years ago.
 
Without getting drawn in to ‘how quick can you lash out a new build’...
1st fix basic spec house.
On your own you could probably chop all the boxes in one day and start drilling out joists. Day two finishing drilling the joist holes then start pulling cables. Day three full on cable pulling day. Day four finish off wiring and do all your capping and tidy up any odd bits.
Day five if necessary

?
No chopping in boxes as dot and dad so 25mm boxes are used only ones to be chopped in are 35 & 47mm for the grid, cooker and shaver sockets.
All the large housebuilders use I beams with the webbing or have the knock out holes if need drilling they are only thin ply type wood.
 
Most new builds these days are fast fix boxes , fine for switches but after a few months of pulling plug tops in / out from 13a sockets they start to break the plaster around the wings.
Then looks dog rough
 
I was helping out a friend back end of last year to get some new builds done before christmas on a labour only basis. Only 8 houses.
He had previously worked for a large contractor who do a lot of the new build developments around here before going solo.
They typically would first fix a standard 3 bed house in 4 days. Second fix and testing for certification taking another 2 or 3 depending on spec.
They didnt see point in rushing normally because they were usually on a price per house rate depending on size, and there was always a week allocated for the electricians in the schedule, so they could take upto 5 days for first fix before the other trades got held up. they had another 3 or 4 allocated for the 2nd fix. So always had capacity for slight over runs
With some builders they plan out the job poorly and things are always being moved around. it often shows in the final finish of things like skirting and decoration within the property as the customer doesnt see the wiring.
 
Most new builds these days are fast fix boxes , fine for switches but after a few months of pulling plug tops in / out from 13a sockets they start to break the plaster around the wings.
Then looks dog rough

I've never ever had any problems like that with dry lining boxes, always use Appleby, maybe the different lug design helps avoid such issues ?
 

Reply to Large builders in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
388
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
971
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

Echo above, as someone who's probably similarly inexperienced I have set myself up a per point spreadsheet and whack it all in there. This has...
Replies
9
Views
585
  • Question
My bafflement increases. I swapped the offending light with one elsewhere on the back of the house - one of those that's on a circuit of its own...
Replies
5
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top