Skimpy Wan
Hi,
I've got a customer who has a LED floodlight, with PIR, who requires an override facility, rather than being on the normal 90 second time delay.
As the fitting is wired in the manufacturers 3 core flex, how can this be overridden?
It has been wired in 3-core & earth but, obviously, only the Line, Neutral & Earth are currently being used (so a spare core). I was wanting to use a 3-way rocker switch, but still not sure how to get the switch wire direct to the LED fitting and bypass the PIR.
I've got a customer who has a LED floodlight, with PIR, who requires an override facility, rather than being on the normal 90 second time delay.
As the fitting is wired in the manufacturers 3 core flex, how can this be overridden?
It has been wired in 3-core & earth but, obviously, only the Line, Neutral & Earth are currently being used (so a spare core). I was wanting to use a 3-way rocker switch, but still not sure how to get the switch wire direct to the LED fitting and bypass the PIR.