Thought id post something that needs a little bit of thought to achieve. Customer has a 12KW electric Boiler which the control side is wired as an S-plan and wants to install a 10.5KW shower in the new en suite they are having built. The main cut out fuse is 80A and customer doesn't want to pay to have this upgraded....... How would you go about making this work?
 
Just quickly passing through as got a lot on today, but would it be possible to wire some sort of contactor off the boiler wiring so that the shower is isolated when the boiler is in use, and the shower is made live when the boiler is off.
 
Or in reverse, so the shower limits the boiler use? Or what about doing away with the shower altogether and just running it off the boiler hot water supply?

That's my thinking so the shower limits the boiler use as realistically the customer isn't going to be in the shower for that long and wouldn't matter if the boiler wouldn't fire for 15 minutes or so.

So we are going to have a 10mm T&E on a 50A circuit breaker installed clipped direct in to a cupboard directly behind the shower where there is going to be a double pole 50A switch. The electric boiler is in the next cupboard along and all the control wiring is done as an S-plan.

What would be the best way in your opinion to install and connect what we need to achieve this?
 
I'm thinking would it be possible to take a feed from the load side of the switch to the No HW and No CH contacts so that when the shower switch is on the pump gets a signal for no hot water or heating, and therefore the switched live to the boiler doesn't work.

Or am I closer going down the contactor route to handle this like I originally thought? Grasping at straws a little.
 
I'm thinking would it be possible to take a feed from the load side of the switch to the No HW and No CH contacts so that when the shower switch is on the pump gets a signal for no hot water or heating, and therefore the switched live to the boiler doesn't work.

Or am I closer going down the contactor route to handle this like I originally thought? Grasping at straws a little.

Very close mate. so looking at an s-plan diagram the oranges are the switched live to the boiler. Take a feed from the load side of the 50A DP switch to a fused connection unit, from the fused connection feed the coil of the relay and take the oranges through the normally closed contact of the relay.
[ElectriciansForums.net] Little Teaser For The Trainees :-)
[ElectriciansForums.net] Little Teaser For The Trainees :-)
 

Reply to Little Teaser For The Trainees :-) in the Electrical Course Trainees Only area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
380
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
957
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top