Hi everyone we are in the process of installing a new heat pump in our Victorian maisonette. The whole house is 4 stories and it was split into two separate flats a few decades ago. The service is looped between us and the upstairs flat. UKPN came around and estimated that we need an upgrade to a three phase fuse. They said we need to cover the cost (almost 8000ÂŁ!). From all the reading I have done the cost to unloop the service should be covered by the UKPN and not passed on to us. Also the requirement for a three phase fuse upgrade seems to be so that both properties are covered rather than just us (a single phase 100smp fuse should be enough for our property only) . I would have thought that 2 separate single phase 100amp installations should also suffice. What am I missing here? I also read that from April 2023 DNOs will be responsible to cover these costs anyway? No one at UKPN was forthcoming with information.. Does anyone know what needs to happen in this case?