Ive got a 20amp 2 pole proteus din rail contactor
Proteus - Products
and proteus 16amp 1 mod din rail timer....
Proteus - Products
Hoping to use for night day switching of a selection of flurorescent (7 x 70w )and downlights (12 x 50w)with a total load of about 6 amps/1482w.
Thing is not quite sure how to go about the wiring...
I was going to have a 6 amp mcb supply the timer and 10 supply the contactor and 10 amp supply the lighting...is this correct? Was advised to have each seperatly supplied....
But now i lost the plot a bit on how to wire as no good diagrams..NOt knowing what numbers do what ie where neutrals go and load side etc ....
i dont need any switches just to be switched by timer...
Also is it ok to have all mcbs on RCD?
Sorry its a bit of long winded one guys but been a while since had my head in this.....not good really....
many thanks
Proteus - Products
and proteus 16amp 1 mod din rail timer....
Proteus - Products
Hoping to use for night day switching of a selection of flurorescent (7 x 70w )and downlights (12 x 50w)with a total load of about 6 amps/1482w.
Thing is not quite sure how to go about the wiring...
I was going to have a 6 amp mcb supply the timer and 10 supply the contactor and 10 amp supply the lighting...is this correct? Was advised to have each seperatly supplied....
But now i lost the plot a bit on how to wire as no good diagrams..NOt knowing what numbers do what ie where neutrals go and load side etc ....
i dont need any switches just to be switched by timer...
Also is it ok to have all mcbs on RCD?
Sorry its a bit of long winded one guys but been a while since had my head in this.....not good really....
many thanks