I was told today by a spark a lot more experienced than me that I need to bond the following, I'm inclined to agree but could do with some opinions.
Water comes in on 15mm copper where there is a 300mm length before it is then converted to PVC speedfit,this whole section is hidden in a cupboard, it does go back to copper eventually.
Is it worth bonding that small section?
I was told today by a spark a lot more experienced than me that I need to bond the following, I'm inclined to agree but could do with some opinions.
Water comes in on 15mm copper where there is a 300mm length before it is then converted to PVC speedfit,this whole section is hidden in a cupboard, it does go back to copper eventually.