Main Earthing On DB Help | Page 3 | on ElectriciansForums

Discuss Main Earthing On DB Help in the UK Electrical Forum area at ElectriciansForums.net

Joined
Jan 25, 2016
Messages
74
Reaction score
7
Location
Nottingham
Hi

Was visiting a friends house yesterday who is having some renovation work done and I was just being nosy but came across his DB (that is due to be changed) with what looked like no main earth. There is an earth connected in the DB but it’s just cut off below the main income ( see pic)

What would people do in this case? Do the suppliers have to provide an earth or is it something an electrician would sort?

[ElectriciansForums.net] Main Earthing On DB Help
 
Why the big argument, at the end of the day it's a judgement call. Who is living there (no one) and what do you have to hand.
If it's an elderly person and it's the middle of winter isolating the supply would basically be murder, if it's a scout hut with kids running around every evening then turn off and leave a note at the door, then it's down to the incoming leader to decide whether to turn on again.

I'm sure people can think of better examples, but although legallythere's no obligation or right to isolate the supply, but the same applies to saving a drowning kid and we would all do that.
 
Last time I went to someone's property, I had to be invited in and seek their permission to isolate the CU to work on it :rolleyes:

You can only advise some one, if they choose to ignore your advice thats down to them. Some people are a bit thick mind.

You guys.
 
the op says its his friends house where nobody is staying currently, and in this case i would be the electrical police

what if the house burns down and you could have prevented it by simply turning off the power?

ive just replaced a shower cable at my grans, the shower is about 5metres from the fuseboard, plenty of access below the floor, but obviously crawling another few metres to the fuseboard area would have been too much effort for the previous "sparky", so into a junction box it went

the live and earth terminals were basically touching in the junction box after several years of sitting on the ground under the floor

what if this house in the OP has a similiar fault?

but hey if youre happy with a potential fatality then thats on you.
 
I would presume the OP has done what was suggested over the weekend and advised the homeowner to contact the DNO today.
OP wasn’t working in the property and as such can only give advice to his friend regards safety.
 
the op says its his friends house where nobody is staying currently, and in this case i would be the electrical police

what if the house burns down and you could have prevented it by simply turning off the power?

ive just replaced a shower cable at my grans, the shower is about 5metres from the fuseboard, plenty of access below the floor, but obviously crawling another few metres to the fuseboard area would have been too much effort for the previous "sparky", so into a junction box it went

the live and earth terminals were basically touching in the junction box after several years of sitting on the ground under the floor

what if this house in the OP has a similiar fault?

but hey if youre happy with a potential fatality then thats on you.
Nobody would be happy with a fatality, but how long has the installation been without a main earth? Years probably....OP didn't mention bodies strewn all over the place. The OP's pic also shows an RCD main switch....no mention of Zs readings but I'll wager it'll be picking up an earth from somewhere and is in fact safe even if non compliant. Nobody is advocating walking away, only that we are not legally obliged to interfere with a private installation, we can lead the horse to water but we cant force it to drink.
 
DNO will bat it back to you anyway unless it can be PMEd.
Always carry a rod in the van. Good for TT installs and comes with a bonus of feeling nice and weighty in the hand!
 
I was called out several times by the DNO for situations like this to fit a TT earth.
Depending on the time of day the DNO would either fully isolate the supply and remove the service fuse or if it was dark and an older system they would isolate the socket ring(s) but leave the lighting ring(s) energised (I’m sure you guys can work out the logic there).
Go in, install the TT, ensure the Ze was within spec and then reinstate full supply.
 

Reply to Main Earthing On DB Help in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
448
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
1K
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

When I was on the electric board We had a pair of pillocks connect a housing estate to a very large genset, the n lead was in two parts and not...
2
Replies
28
Views
4K
  • Question
By retired electrician, I mean that I have retained my ticket but no longer do installation work. Thanks for the clarification. I missed that it...
Replies
2
Views
512

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top