Came across this on an install today and wondering if its correct,
Main Fuse was 100A, cables going into a meter then from a meter into a 63A switched fused isolator, Then 16mm Armoured from isolator into fuse board about 15m away.
now i'm confused as to why its 100A Main fuse - 63A isolator then back to 100A (Main switch in CCU) or is this normal and ok.
Then was confused as to why water needed to be earthed if its plastic - copper - plastic all over the place
Main Fuse was 100A, cables going into a meter then from a meter into a 63A switched fused isolator, Then 16mm Armoured from isolator into fuse board about 15m away.
now i'm confused as to why its 100A Main fuse - 63A isolator then back to 100A (Main switch in CCU) or is this normal and ok.
Then was confused as to why water needed to be earthed if its plastic - copper - plastic all over the place