F
flinker
working in a new build contract.have blocks of flats built in two,s obviously upper and lower.meter for upper flat is outside building at lower flat level. have been instructed by site agent to run upper flat supply from meter point through lower flat area and in to upper flat.have refused as i am not sure of safety aspect and regulations concerning this,my foreman is not too sure either i believe it would be safer to run supply outside building and add protection rather than running cable through the building inside.any help would be appreciated...