Hi
I have been asked to make a circuit live before the work has been completed.
The situation is that the boiler has been moved into an extension. The extension is at the very early stages and i will be running the cable from the C/U (No ring to spur from yet) under a floor in the house and along the floor of the extension (Upper floor) down the wall and to the boiler. This will leave the cable exposed down to the boiler and all the way along the joists.
Should I run it all in conduit so it is at least protected?
Matt
I have been asked to make a circuit live before the work has been completed.
The situation is that the boiler has been moved into an extension. The extension is at the very early stages and i will be running the cable from the C/U (No ring to spur from yet) under a floor in the house and along the floor of the extension (Upper floor) down the wall and to the boiler. This will leave the cable exposed down to the boiler and all the way along the joists.
Should I run it all in conduit so it is at least protected?
Matt