Let's face it, how many times do 2 showers run at the same time? It's bad enough having 1 running and then flushing the loo!
Agree that the whole MD thing needs a rethink. For what it's worth, I always put the fuse rating on a CU change. The point of MD calculations is when you are designing a new system.
Agree that the whole MD thing needs a rethink. For what it's worth, I always put the fuse rating on a CU change. The point of MD calculations is when you are designing a new system.
Last edited: