E
elsparko
really trying to get the customer to see sense, they have supplied scaffold tower for lighting replacement about 5metres off the ground, which i have been pottering away at with this shitty scaffold tower getting stuck in the sand below and hitting against the beams of the shed itself
almost tipped it several times today, got some 1.5 swa i need to throw into the very top of the shed, really dont want to do this from the scaffold tower as it will take all day to run 1 length of cable!
ive tried explaining that i would already be finished by now with the use of a scissor lift but they do not seem to see the efficiency
any health and safety i can throw at them to avoid doing this job in such a backwards way?
almost tipped it several times today, got some 1.5 swa i need to throw into the very top of the shed, really dont want to do this from the scaffold tower as it will take all day to run 1 length of cable!
ive tried explaining that i would already be finished by now with the use of a scissor lift but they do not seem to see the efficiency
any health and safety i can throw at them to avoid doing this job in such a backwards way?