VeeKay22
DIY
Hi, I’m just looking for some advice on what can be done. I wouldn’t be touching any of it myself! We are trying to be unlooped and have a fuse upgrade as we have two electric car chargers but northern power grid is now unwilling to do the work due to our meter box being congested! Would we just be able to move things about to create more space and make it neater or would something need to change further. Such as getting a bigger meter box (which I assume would be very expensive) or potentially moving the connections for the Ev chargers out of the meter box? A consumer unit for each Ev charger is on the wall behind the meter box currently. Hopefully someone can help guide us in the right direction so that we can have the work done by the power grid soon!