Hi All
Normally meter tails are the customer responsibility from meter to CU. However just been to look at a job that has a new sealed meter and main fuse. A main switch has been installed between meter and CU. Does this mean that DNO are now responsible for tails up to the main switch they installed. They have advised customer to upgrade tails.
Havent been to look at the job yet but would like some feed back before I go
Thanks in advance for your views.
Chris
Normally meter tails are the customer responsibility from meter to CU. However just been to look at a job that has a new sealed meter and main fuse. A main switch has been installed between meter and CU. Does this mean that DNO are now responsible for tails up to the main switch they installed. They have advised customer to upgrade tails.