Method statement on a PIR | on ElectriciansForums

Discuss Method statement on a PIR in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

M

MWG1019

I have been asked to produce 3 method statements for work we do by our grim reaper Health and safety officer. One for work carried out on fuseboards, one for installation work we do (Domestic wiring in houses, flats etc), these 2 I have done, but the third one is for Inspection and testing. Having to go through the whole process of testing a property is fine..... but to have to write that process down is ridiculous. I was wondering if anyone knows of any online examples there are for it. Something I maybe able to cut and paste? Or may be just print off and write, See attached sheet.
 
Thanx BlueSparx. I couldn't get it from your hyperlink but I just googled Langston Jones and found the method statement. I thought i was gonna have to describe each test but after reading that, it's not the case. Once again, Thanks
 

Reply to Method statement on a PIR in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
265
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
756
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
740

Similar threads

  • Question
CONCLUSION (Couldn't see how to edit title) It was not belting it down with rain today, so lifted the manhole cover. The pump is about 2 metres...
2 3 4
Replies
45
Views
6K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top