anyone know the correct wordings or scenarios for limitations on a minor works for not doing the ir or r1 + r2 test ..
.like unable to take cover off db or cannot fully isolate db etc
 
anyone know the correct wordings or scenarios for limitations on a minor works for not doing the ir or r1 + r2 test ..
.like unable to take cover off db or cannot fully isolate db etc

For me, it would be exceptional to have limitations on what is already a very limited document but you would use phrases such as:

"unable to complete R1+R2 testing due to........"

"Unable to carry out insulation resistance testing due to......"

Each limitation devalues the final document.
 
there is a limitations section on a minor works cert but if your working on a circuit you can only isolate by removin the fuse and its an old hrc board thats 3 phase and live as ---- i,d say you can use limitations ..........commercial minor works not domestic ...............etc
 
The tests required for the Minor Electrical Installation Works Certificate are the minimum that are required, as such it wouldn't be reasonable to not carry them out.
 
there is a limitations section on a minor works cert but if your working on a circuit you can only isolate by removin the fuse and its an old hrc board thats 3 phase and live as ---- i,d say you can use limitations ..........commercial minor works not domestic ...............etc
Not on any based on the model forms in BS7671 there isn't.
 
also if the nuetrals and earths are not correctly numbered and just rammed any where for you to identify the correct cable to do the r1 + r2 or the ir test .............


or cant turn board off due to other people needing power ...etc
 
there is a limitations section on a minor works cert but if your working on a circuit you can only isolate by removin the fuse and its an old hrc board thats 3 phase and live as ---- i,d say you can use limitations ..........commercial minor works not domestic ...............etc

On the IET model forms, there is no distinction between commercial/domestic MEIWC but I notice on the NICEIC MEIWC there is a box labelled: "Agreed limitations, if any, on the inspection and testing".

Rather poor form I'd say.
 
yes iq there is ...............makes the job harder if your on a really old db thats like a mad womans knitting inside .....
to unsafe to work live (which we all know is a no no unless absolutely neccessary )
 
A very common and reasonable limitation when testing an altered existing circuit is a L-N IR test......not always practical to carry out,in fact I cant remember the last time I did....IMO the limitations box on NIC forms is essential.
 

Reply to minor works limitations in the Periodic Inspection Reporting & Certification area at ElectriciansForums.net

Similar threads

You would have thought they'd have a switch to flick on and off to engage an override. Not on each PIR but an actual light switch
Replies
5
Views
1K
I usually put something like this To assess compliance with BS7671 for continued safe operation (5 year periodical inspection)
Replies
8
Views
411

Recommended Sponsor News

  • Article
thanks for the clarification. ( also thanks to Dan. ).
Replies
6
Views
2K
  • Article
More info on link below http://sbsc.uk.net/
    • Like
2
Replies
22
Views
9K
  • Article
Happy Friday Everyone! Subscribe for more jokes direct to your mailbox or send us your own jokes to be in with a chance of featuring, by clicking...
    • Like
2
Replies
27
Views
6K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top