Hi Guy,

I’ve contacted my DNO Scottish power and they’ve quoted me a price of £760 to move my connection point and meter. I seem to be doing most of the work with them pretty much terminating it.
I’ve been looking for someone else to do the work as I’ve believe it’s ‘contestable’ but I’m having no luck.
Does anyone have an advice. Cheers
 
I think most of us have seen it. Not surprising given what utter ***** UKPN are to deal with.

I made sure I had a TT setup in place last year for when they came to move a cutout in a domestic house. Reason being there was a large extension going on and nobody living there. The guy said basically wtf did you do that for, we have PME here!

Next job a few months later UKPN turn up to move a cutout, happening as part of a kitchen refurb. No outside works/plant etc or even walls being knocked about. Literally 1 ceiling down and a rejig of electrics/plumbing, bit of plastering and kitchen refit. Guy refused to do it as 'construction sites need to be TT'. I very nearly knocked the **** out. Had to sort it and rebook. The guy who turned up the second time asked wtf I had set it up as TT. Irritated me, but at least it saved me having to call them out a 3rd time to connect the PME up once the 'construction works' were finished.
 
ximilar farce. client needing a 3 phase supply to new build. £7000 as road had to be dug. DNO turn up and refuse to install cable etc. as it would mean walking under (professioinaly erected) scaffolding to get to meter box.
 
this one wasn't any height work. just thar scaffold was erected and they'd have to stand under it to connect cable. ended up client had to build a 6' x4' brick "shed" to house the cut-out and meter, then we had to fun a 25mm 5 core SWA 6m to the house.
 
The bit they wouldn't do was to stand under the scaffold and mount the external joint box on the wall.
apparently it was H&S rules they were afraid something would drop on their heads and knock some sense into them.
 

Reply to Moving Connection point and meter in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
380
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
956
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
1K

Similar threads

  • Question
The last couple of de-loops that I have been involved with had the single phase supply replaced with a three phase cutout (as I believe the DNOs...
Replies
5
Views
1K
  • Question
Sorry for the late reply I found it very difficult to find work but I’m not sure if this was down to Covid and all the lock downs happening just...
Replies
2
Views
623

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top