D
Deleted member 9648
Wired two RCD sockets on a radial today next to a sub-DB in a large factory unit. The new circuit was connected to an existing redundant 20a MCB which had served a control item which I'd disconnected a while back. Now based on the possibly iffy logic that because the protective device was already in place I decided that I'd get away with a MW because I wasn't adding anything to the existing DB.
Truth is I just couldnt be assed to gather the plethora of information required for an EIC to be correctly filled in for such a p***yass job.
A MW seemed more than adequate...Preparing now for a right good telling off.
Truth is I just couldnt be assed to gather the plethora of information required for an EIC to be correctly filled in for such a p***yass job.
A MW seemed more than adequate...Preparing now for a right good telling off.