O
Octopus
Is it me or is all this paperwork getting to you too?
Doing a small bathroom job today and as there is no RCD protection I'm changing the MCB to a RCBO.
Can I use a MWC or do I have to do an EIC??
tin hat on
thanks
Doing a small bathroom job today and as there is no RCD protection I'm changing the MCB to a RCBO.
Can I use a MWC or do I have to do an EIC??
tin hat on
thanks