My first big job, made up of lots of little jobs, please help with pricing! | Page 3 | on ElectriciansForums

Discuss My first big job, made up of lots of little jobs, please help with pricing! in the UK Electrical Forum area at ElectriciansForums.net

Gringoking88

-
DIY
Joined
Jun 18, 2015
Messages
176
Reaction score
50
Location
London
Hi all,

The title says it all really, I have been asked to do a series of jobs in a 2 bed flat based in South West London. He's a really nice man and want to charge a fair price. Historically, I have only completed individual jobs at a time so am a bit stumped of how to charge for what he wants. I would really appreciate some advice from those more experienced. I have attached a simple spreadsheet below that I composed of what he wants, with brief explanations and as said would value your thoughts. The prices proposed exclude the cost of materials e.g. downlights, switches etc. If I am way out, then apologies in advance and go easy lol!!!

Many thanks,

M
 

Attachments

  • copy Estimate - Invoice.pdf
    50.2 KB · Views: 192
Have a chat with one of the staff, send them a copy of an invoice and providing you meet the other requirements you should be able to get access to The Electricians Arms.
Don't forget to tell him about the initiation ceremony, and buying drinks for everybody.
 
It's a bit of a gamble on how long an accessory change can take too, normally easy and quick until you find some where the original has been really badly done, short cables in sockets then L&N the opposite way round on the new ones,metal switches that need a new earth link from the backbox, plate screws cross threaded then rammed in, fun when they shear off taking them out etc etc. I'd look at the entire job in terms of days then allow a bit on top for snags, having said that though the OPs target hourly rate seems high to me.
 
If your unsure just agree a day-rate with your customer. Tell him you can't be sure how long some of the jobs will take so its best for both parties if you charge just for your time. Your neck of the wood about £180 a day. If you have to get any gear put 20% on top to cover your time getting it.
 

Reply to My first big job, made up of lots of little jobs, please help with pricing! in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Sticky
  • Article
Wicked I've just actually looked through it and it's very smart. Some good stuff in it. There's a tile association company that do a magazine...
Replies
2
Views
318
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
297
  • Article
Hi everyone, Another weekend, another sale! Get ready for colder days with Haverland Radiators, combining efficiency with modern design. Keep...
Replies
0
Views
361

Similar threads

  • Question
Ive done 14 hours .Been well paid and happy about it . But once its more than 3 hours of a day .... you might have lost the chance to fit another...
Replies
15
Views
2K

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top