A
Abruno
Yea was thinking that westward but there was a existing Henley block that was direct under the meter and the tails to the meter are really short. So cant really alter them as that is part of the DNO's side
why not replace the existing board with one big enough to cope with the extra circuits, rather than have 2 boards?
Can't argue with the logic of that!Mhar in case the fuse does get upgraded to 100amp fuse in the future its called covering myself..