Hi all
New to pricing and just wondered what the majority would charge then I got a ball park figure
Doing a chip shop refit. Just the front. Not the kitchen
6x high level sockets for breakfast bar run in metal conduit and surface boxes 9m run
5x high level sockets for display TV screens also in conduit 8m run
4 pendants (not rewired, just extended) again run in conduit 8m run
5x data points totalling 20m run in conduit
For the above materials have been provided
Also... (materials not provided for the following)
3 phase supply for cooker including isolation switch etc etc, run externally 13m run,
Replace old CCU with New 10 way
Any ball park figures much appreciated
New to pricing and just wondered what the majority would charge then I got a ball park figure
Doing a chip shop refit. Just the front. Not the kitchen
6x high level sockets for breakfast bar run in metal conduit and surface boxes 9m run
5x high level sockets for display TV screens also in conduit 8m run
4 pendants (not rewired, just extended) again run in conduit 8m run
5x data points totalling 20m run in conduit
For the above materials have been provided
Also... (materials not provided for the following)
3 phase supply for cooker including isolation switch etc etc, run externally 13m run,
Replace old CCU with New 10 way
Any ball park figures much appreciated