S
Squid
for a friend, haven't been to look at this myself yet but will do before the New Year and was wondering is anyone has comes across a similar situation.
Friend has been arguing with EoN for the last 3 years as it seems he has a bodged install from the mains head and to me it seems but I can't see clearly from the photo that the meter the CSU to the left is connected to also links to the Wylex Isolater which then goes to a flat on the first floor which has its own meter, is this possible?
Just asking before I pop down and draw up a schematic of the wiring as he is now at a solicitors but his Electrician has said that the Henley block has been wired incorrectly, any advice pointers appreciated.
Friend has been arguing with EoN for the last 3 years as it seems he has a bodged install from the mains head and to me it seems but I can't see clearly from the photo that the meter the CSU to the left is connected to also links to the Wylex Isolater which then goes to a flat on the first floor which has its own meter, is this possible?
Just asking before I pop down and draw up a schematic of the wiring as he is now at a solicitors but his Electrician has said that the Henley block has been wired incorrectly, any advice pointers appreciated.