Hi all
I am retired but needed a project so self building our new bungalow on an existing plot with power.
I have Part P but limited experience on a totally new supply installation.

The main supply and meters will be into my new white box on outside wall at 100amp and this has been agreed with Western Power.

My consumer unit is approx 7 mtr away in a cupboard within the new build.

The property design has a concrete block & beam floor which once laid is not accessible so I need to ensure I install any channel or duct prior to thread cable through later in build.


Earth will be a new spike and I will install this near the box to take a 16mm earth cable into the build.

I'll need an 80amp fuse within supply box for my feed.

I need to install a duct or conduit under the floor to thread supply cable.

1/ Should this be plastic or metal?

2/ Should I use SWA or just shielded cable within the duct or conduit?

3/ What size cable for 100/80 amp supply is recommended?



Regards
 
If it was my own house I was building I would be installing earth electrodes too even if it was a PME supply.
To my mind it is a perfectly sensible idea, and if I'm footing the bill then why not?

Plus there are many areas without PME available, plenty of areas around here don't have it available
 
If the tails are over 3 mtrs which in this case it is then you will need to install a switch fuse unit at the intake which will protect the cable to your CU. Now this is a DNO requirement and not a BS 7671 regulation contrary to what some ppl may tell you. Some DNOs stipulate that tails over 2 mtrs require a switch fuse.
 
If the tails are over 3 mtrs which in this case it is then you will need to install a switch fuse unit at the intake which will protect the cable to your CU. Now this is a DNO requirement and not a BS 7671 regulation contrary to what some ppl may tell you. Some DNOs stipulate that tails over 2 mtrs require a switch fuse.

And EDF don't allow them at all meaning the CU must be within 3m of the main fuse
 

Reply to New Build. Consumer Unit 7 mtrs from Supply Box Installation Advice Required in the UK Electrical Forum area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
296
  • Sticky
  • Article
Good to know thanks, one can never have enough places to source parts from!
Replies
4
Views
804
  • Article
OFFICIAL SPONSORS These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then...
Replies
0
Views
840

Similar threads

It won't be notifiable though as its not a new circuit, if you change the the tails from 16mm to 25mm is that notifiable? No, if you add an...
Replies
5
Views
441
He said something about a fused something as the lights hardly take anything .. I told him was mostly cordless tools so just chargers ..told him...
Replies
11
Views
615

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top