Hi guys. Recently passed ELECSA assessment, woohoo. I'm after a bit of advice. I've been asked by a local firm to test & certify there air source heat pump wiring. To date they've fitted 16 that need doing, already commissioned. I've been told that they've all been put on a dedicated circuit, but getting confused as to wether I should ensure rcd protection regardless of cable installation method.
Thanks in advance.
Thanks in advance.