OP
Thanks for the link Lee
Tony, good point, MICC was used (I believe) because the majority of the run goes through a church which I believe is subject to regs because of the number of people.
I'll be using 500mm of 16mm tails between the old CU converted to a junction box / isolator.
Thanks
Tony, good point, MICC was used (I believe) because the majority of the run goes through a church which I believe is subject to regs because of the number of people.
I'll be using 500mm of 16mm tails between the old CU converted to a junction box / isolator.
Thanks