well, I don't really see what the problem is?
the bloke is an old electrician who has been away for the installing side for a number of years, currently works in panel wiring, holds 17th edition, and 2391 and does not have a reconised apprenticeship.

How can I make that more clear?
 
well, I don't really see what the problem is?
the bloke is an old electrician who has been away for the installing side for a number of years, currently works in panel wiring, holds 17th edition, and 2391 and does not have a reconised apprenticeship.

How can I make that more clear?

So is 40 the new "old"??

Rollocks.
 
well, I don't really see what the problem is?
the bloke is an old electrician who has been away for the installing side for a number of years, currently works in panel wiring, holds 17th edition, and 2391 and does not have a reconised apprenticeship.

How can I make that more clear?
By not talking nonsense?

This "other spark" is you, or as you describe yourself in a post some 6 years ago (I guess you added the 17th qual since).
http://www.electriciansforums.co.uk.../3389-becoming-electrcian-already-2391-a.html
 
well, I don't really see what the problem is?

I am an older electrician who has been away for the installing side for a number of years, currently works in panel wiring, holds 17th edition, and 2391 and does not have a reconised apprenticeship.

I've corrected that for you!
 
My understanding, is that an electrician is anyone (whether qualified or not) who undertakes electrical work for remuneration.
There has been some reference made to a recognised Apprenticeship, but I am not sure of the context.
I understand that the wiring is to an extension.
Has planning permission been applied for and awarded for the extension?
If yes, did the application include any wiring?
If yes, then the requirements of Part P have been satisfied, and the person who conducted the electrical work is not required to be a member of a Competent Persons Scheme and is not required to self certify.
It may be that the person who conducted the electrical work, did not notify Building Control to arrange inspections at the required phases of the construction?
However, I would have expected that an EIC issued by someone who holds the 2391, to be acceptable to any Building Control.
 
Look this is very straight forward. The 40yo "electrician" would/should have went through a C&G based apprenticeship which at 40 (If he started at 16) would have him training from 91-95....ish.
Apprenticeships were still C&G and I believe the NVQ3 was in force from 95 onwards but was available many years before.
C&G 2360 Part A B and C rings a bell with AM1, AM2 and any addons - 2391 ect. This would have been during the 15th Edition regs.
So there is the background for a potential 40ish yo spark......I would love to know what was/is different now lol.
Either the OP has mixed up the details or something just simply isnt true.
Another point worth noting is the fact that ANYBODY could in theory test and inspect....as long as they are competent......maybe pre part p this guy was deemed competent but for silly reasons they are saying now they are not.
 
Why lie ? 123 has rumbled you well and truly.

fantomcat, if this is the case, then you will have only one or two options to get your completion certificate from the council;

1) Tell the council you have completed the work without being an approved installer under a governments competent persons scheme. They will arrange an inspection, testing of the installation and charge you a fee, typically £400 + vat.
2) See if you can arrange yourself for a scheme registered electrician to carry the tests etc for you and issue a certificate.
3) Do nothing and hope the problem goes away. Purchase an 'Indemnity Insurance', for when you sell, but as the LPA know you have had an extension, don't think that ones a goer.

Think option 1) is the simplest, if not the cheapest. But you did save a few bob doing the work for yourself, if the extension was for yourself?
 
If the electrical work is not carried out by an approved installer, then you have to apply to the lbc before starting work. The lbc may then employ an approved installer to check the work as it progress, bit like they come have a look at the various stages of the building work.

You would need to check with the local building control if non approved installer was used, and hadn't made that submission in the building regs application.
 

Reply to New Extension regs, 2391? in the Electrical Wiring, Theories and Regulations area at ElectriciansForums.net

Similar threads

Surely that will depend on what is connected to it. And the nominal voltage between phases is 400V (+10%/-6%).
Replies
3
Views
912
The challenge that you have with this is that you've no confirmed start point. Because you have a lack of an EICR you don't actually know what...
Replies
7
Views
531

Recommended Sponsor News

Quickwire Now Sponsor ElectriciansForums.net

I am sure you will join me in welcoming our newest sponsors of ElectriciansForums.net - Quickwire! They have decided to join us after seeing you guys discussing their products here. Now we have an expert on board that you can chat to @Quickwire-Sam who will be happy to answer your queries!

[ElectriciansForums.net] Quickwire Now Sponsor ElectriciansForums.net


@Quickwire-Sam said "At Quickwire, we're all about speed, safety, and reliability. We're a family-run business, and every Quickwire connector is proudly made right here in the UK, ensuring noticeable quality. In short, Quickwire is the fastest connection method on the market. Whether you're an experienced electrician or a DIY enthusiast, Quickwire makes electrical connections ridiculously quick and easy. We're passionate about blending British craftsmanship with innovation. If you have any questions or if there's any way we can help, please just ask me!"

Exclusive Forum Offer! Free euro 2024 wall chart for first 10 responses!

Hi everyone,

We have 10 exclusive Uheat EURO 2024 Wallcharts to giveaway for Electricians Forum Members! The first 10 people to reply YES to this thread - I will message and get them sent out to you just in time for this years tournament! GO GO GO

PCBWay Now Sponsor ElectriciansForums.net!!

I hope you will all join me in welcoming our newest sponsor to the forum PCBWay! You can contact their friendly people by sending a message to @PCBWay who will be happy to answer your queries.

Welcome to the community and thanks for your sponsorship!

[ElectriciansForums.net] PCBWay Now Sponsor ElectriciansForums.net!!

PCBWay provides services including PCB Prototype and batch Production, PCB Assembly (SMT), 3D Printing, CNC Machining, PCB Design, Electronics Modules Selling, etc. We are committed to meeting the needs of global makers from different industries in terms of quality, delivery, cost-effectiveness, and any other demanding requests in electronics.

[ElectriciansForums.net] PCBWay Now Sponsor ElectriciansForums.net!!

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top