Hi all,
If replacing an old metal clad consumer unit with a new Plastic one, where the metal conduit is used as the CPC throughout the installation, is it acceptable to mount the new unit directly over the case of the old unit, linking the two with a length of 16mm earth, in order to keep the earth continuity ??
A friend of mine whos company has a contract with the council, says they always do it this way, because it can sometimes be a right pain and fairly time consuming disconnecting the conduit from the old consumer unit and reconnecting to a new metal clad one.
Has anyone else ever done it this way ?
If replacing an old metal clad consumer unit with a new Plastic one, where the metal conduit is used as the CPC throughout the installation, is it acceptable to mount the new unit directly over the case of the old unit, linking the two with a length of 16mm earth, in order to keep the earth continuity ??
A friend of mine whos company has a contract with the council, says they always do it this way, because it can sometimes be a right pain and fairly time consuming disconnecting the conduit from the old consumer unit and reconnecting to a new metal clad one.
Has anyone else ever done it this way ?