J
Jimmyb
hello all, can someone please advice me the best way of filling out EIC form when doing sub-main supplies.
I doing a log cabin installation and i have made the cabin a tt due to the supply being 30 meters away and being TN-CS.
The bit I'm not sure on is where, if at all, do i put the earth rod resistance of the cabin as I'm only recording the supply characteristics and i thought this maybe should noted some where.
I did a house rewire and new garage installation last month and noted on the certificate garage supply on it own line and wrote on under Zs colum the earth rod resistance and then started a new line with the garage circuits and after talking to a few others I'm now think i may of done it wrong and maybe should i have done 2 certificates but i dont really know so was hoping you guys could help me out with this one as i dont want to get it wrong especially twice.
thanks for any advice's
jim
I doing a log cabin installation and i have made the cabin a tt due to the supply being 30 meters away and being TN-CS.
The bit I'm not sure on is where, if at all, do i put the earth rod resistance of the cabin as I'm only recording the supply characteristics and i thought this maybe should noted some where.
I did a house rewire and new garage installation last month and noted on the certificate garage supply on it own line and wrote on under Zs colum the earth rod resistance and then started a new line with the garage circuits and after talking to a few others I'm now think i may of done it wrong and maybe should i have done 2 certificates but i dont really know so was hoping you guys could help me out with this one as i dont want to get it wrong especially twice.
thanks for any advice's
jim