As a follow up to this, assuming my builder is not going to be able to or willing to help provide a proper verification and certificate for the jobs done at my property, can I get another niceic registered electician to verify and certify the job? How much would that cost? Anyone here willing to quote me for this? I live in canary wharf area. Thanks
 
Ring the NICEIC and ask if they allow 3rd party certification like this. If not one of the other Schemes will allow it but someone England based will have to comment for you.

BTW if the NICEIC dont allow this and IF the NICEIC contractor has done something they shouldn't (I'm not saying they have) you should report them to NICEIC. Perhaps ask the NICEIC when/if you call them?
 
In danger of getting my head chewed off for this one.

What is the difference between what has been done here and a QS signing off work and only testing and or inspecting a sample?

I don't like the idea of 3rd party sign off at all but IF these guys have a good working relationship, the 3rd party has seen photographs and trusts the installers testing and workmanship then perhaps it's not all bad.

It's not something I would be involved in but I imagine it's more common than we would like.
 
In danger of getting my head chewed off for this one.

What is the difference between what has been done here and a QS signing off work and only testing and or inspecting a sample?

I don't like the idea of 3rd party sign off at all but IF these guys have a good working relationship, the 3rd party has seen photographs and trusts the installers testing and workmanship then perhaps it's not all bad.

It's not something I would be involved in but I imagine it's more common than we would like.

For a QS to be able to sign off work done by others, he has to have inspected, during and after the work, to advise and ensure the work is being done to the appropriate standards. His role isn't just to test or inspect a sample.

Where I am in England, before TPC came into force, our LABC would accept a satisfactory EICR being carried out of 100% of the installation in lieu of certification. I don't know whether they still would now or whether the OPs LABC would, might be worth asking them.
 
Ring the NICEIC and ask if they allow 3rd party certification like this. If not one of the other Schemes will allow it but someone England based will have to comment for you.

BTW if the NICEIC dont allow this and IF the NICEIC contractor has done something they shouldn't (I'm not saying they have) you should report them to NICEIC. Perhaps ask the NICEIC when/if you call them?

I don't see how any scheme would accept this under TPC as a QS didn't see what was being done and how, during the installation.
 
Plus for those doing 3rd party testing does their insurance company cover it. Often insurance companies only allow you to test your own jobs for periodic inspections too. So always ask your insurance company better safe than sorry.
 
Hi, I have paid him 800 so far as he said he would get the certs. But the certificate seems to be from another guy who didn't come for the job and the details of work doesn't say anything about the new fusebox or new circuit for oven in the kitchen. So I am not sure it's compliant as the certificate should say what's been done I thought.

Photo of first page attached. What does it look like?

Thanks again. Really appreciate your time.

View attachment 43066
Niceic electricians are not allowed to certify someone else's work. Stroma & Nappit registered electricians are the only electricians who are allowed to do it.
 
As a follow up to this, assuming my builder is not going to be able to or willing to help provide a proper verification and certificate for the jobs done at my property, can I get another niceic registered electician to verify and certify the job? How much would that cost? Anyone here willing to quote me for this? I live in canary wharf area. Thanks
You shouldn't have to.
 
Niceic electricians are not allowed to certify someone else's work. Stroma & Nappit registered electricians are the only electricians who are allowed to do it.


And it this attitude thats makes it ok for anyone to complete ans electrical install, then employ sone mug (whose willing) to turn up , test and sign their work off. Can see loads off gas safe boys agreeing to that.

There far too many sparks who are wet bastewards
 

Reply to New member desperately looking for advice in the The Welcome Forum area at ElectriciansForums.net

Similar threads

Welcome to Electricians Forums :) Thanks for signing up. :D
Replies
1
Views
742
The second photo is partly obscured, but enough to see this is a typical Volex board, where the RCD circuits are on the RH side, and the bus bar...
Replies
3
Views
339

Search Electricans Forums by Tags

Tags Cloud - Most Used Words - Use them to search for topics

110v 12v 17th 17th edition 18th 18th edition 2 way 2330 2365 2391 240v 3 phase 6mm access account across adding additional advice advise after again alarm alarms always am2 amendment amp another answer anybody anyone anything appliance appliances application apply apprentice apprenticeship approved area arial armoured around assesment assessment attach aus ausie elec available basic bathroom batteries battery because become becoming becsa before being bell best better between black block blowing board boards boiler bonding book books bosch box boxes brand breaker breakers british bs7671 bsi build builder building bulb bulbs business button c&g cable cable size cables calculation calibration camera can't canada car caravan card career cctv ceiling central central heating cert certificate certificates certification certs certsure change changes changing charge charger charging cheap check cheers christmas circuit circuits clamp class code codes college combi coming commercial companies company competent complete condition conductor conductors conduit confused connect connected connecting connection connections connector connectors consumer consumer unit contact contactor content continuity contract contractor control controller conversion cooker copper core correct cost council couple course courses cover cpc cps crabtree cupboard current customer customers dead deal degrees demand design details detector device dewalt diagram difference different dimmer dimmer switch dimmers distribution diversity diy dno doing domestic domestic installer don't door double downlight downlighters downlights drill driver earth earth rod earthing east economy economy 7 ecs edition eic eicr elecsa electric electrical electrical installation electrical nvq electrical tools electrical wiring electrical work electrician electricians electricians london electricians mate electricians vans electricity electrics electriians mnchester element email emergency emergency lighting employed energy engineer engineering enough entry equipment essex every everyone exam existing experience extending extension external extra extractor extractor fan fan fans fault fault finding faulty fcu final finding fire fire alarm first fit fitted fitting fittings fixed flat flats flex flickering floor fluke fluorescent for sale forms forums found free fuse fused fused spur fuses garage garden gas generator get getting going great green grid ground gu10 guidance guide guilds hager halogen happy having heat heater heaters heating hello help help please help! hi everyone hnc hob home honeywell hot tub hours house how to ideas immersion impedance improver in london incoming induction industrial industry information infraction inside inspection inspection and testing install installation installations installed installer installers installing insulated insulation insulation resistance insurance interesting intro introduction inverter inverters isolation isolator issue issues jib jib card job jobs joining junction keeps kewtech kit kitchen knowledge lamp lamps large lead leads leakage led length lenny level level 2 level 3 light light switch lighting lighting circuit lights little live load local location loft london long looking looking for work loop low voltage ltd machine main main switch mains maintenance makita manchester manual mate max maximum mcb mcbs mcs media megger member members message metal meter meter tails meters method metrel mft might minor missing mobile module money motor mounted mounting moving multi multifunction multiple murdoch myself napit need help needed needs neutral never new new build new member newbie niceic night no earth north not uk not working notifiable number nvq off offer office old online opinions options other out outbuilding outdoor outlet outlets output outside oven overload panel panels parallel part part p passed pat pat testing people periodic person pfc phase phone pipe pir place plan plastic plate please plug plumbing advice pme point points pole position possible post posts power practical practice price prices pricing private problem problems project property protected protection protective pump pvc qualification qualifications qualified quality query question questions quick quote radial range rated rates rating rcbo rcbo's rcbos rcd rcd tripping rcd's rcds reading readings really recommend recommendations red regarding registered regs regulations relay remote repair replace replacement replacing required requirements resistance results rewire right ring ring final ring main roman roof room rose running safe safety salary sale saying scheme scotland screwfix sds second section security self self employed sensor series service services shed shock short shower simple single single phase site plan size sizing skills sky small smart smoke smoke alarms socket sockets software solar solar panel solar pv someone something sorry source south spark sparks sparky split spur spurs standard start starter starting steel still storage storage heater strange strip students stuff sub main suggestions supplier suppliers supplies supply supply to surge swa switch switched switches switching system systems t&e table tails taking terminal termostat test tested tester testers testing tests thank the forum their thermal thermostat these thing things thinking those though thought thoughts thread three three phase through time timer times tips today too tool tools trade trainee training transformer transformers trip tripped tripping trips trunking trying tt system type under underfloor underfloor heating unit units update upgrade urgent used using value values valve van vehicle video volt drop voltage voltage drop volts wall wanted warning water weeks welcome west what's whats where white wind wire wired wireless wires wiring wiring help within without work working works worth wrong wylex years zone zones

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top