power networks are providing new feed/switch/ meter etc as old destroyed in fire. What min. size board do i need to provide?
thanks. ap,
thanks. ap,
The DNO should be supplying and fitting the meter board for their equipment, I would of thought. Is it 1 phase 3 phase?