mikeymoo

When doing notifiable work for an NICEIC assessment, do i need documentation evidence to say ive informed building control?? or do i tell him i have??

When doing notifiable work for an NICEIC assessment, do i need documentation evidence to say ive informed building control?? or do i tell him i have??


How come this thread was moved to business Related???:confused:
 
Last edited by a moderator:
Dont know m8 ! what i did was notify building control and then after i got letter from them saying its been logged and the details etc i rang up and changed the address 2 further times saying the jobs been cancelled etc now i have 3 notified letters lol take your pick !
 
Dont know m8 ! what i did was notify building control and then after i got letter from them saying its been logged and the details etc i rang up and changed the address 2 further times saying the jobs been cancelled etc now i have 3 notified letters lol take your pick !
hi kung
are you with nic??
did they ask to see your completed building notice as mine did :eek:
 
Not with anyone at mo Flukey but even if you dont notify LABC you still wont fail its just a non compliance i know a couple of people this has happend to plus you get time to notify after job completed even if they did ask i only done it yesterday so will take a while to sort.
Regards
Kung
 
Last edited by a moderator:
Not with anyone at mo Flukey but even if you dont notify LABC you still wont fail its just a non compliance even if they did ask i only done it yesterday so will take a while to sort.
Regards
Kung
thats correct kung.
on my assesssment i was told that not notifying labc is a non compliance.
if everything else is in order then this is not a problem.
if however you dont pass and have to notify labc after the event they could ask you to expose wall chases etc to prove correct zones etc as ALL work must be notified to labc BEFORE any work starts :eek:
however if you are 100% certain of your abilities and can satisfy scheme providers expectations then you will be fine :rolleyes:
 
Thats not a bad idea Kung! "Inform LABC about planned work, then after receiving the letter, change the date!" Then subject to passing?? I self certify the work myself! Magic!
Also got a letter saying planned work is logged! genius!!!..;)

Kung for prime minister!!! :cool:
 
thats correct kung.
on my assesssment i was told that not notifying labc is a non compliance.
if everything else is in order then this is not a problem.
if however you dont pass and have to notify labc after the event they could ask you to expose wall chases etc to prove correct zones etc as ALL work must be notified to labc BEFORE any work starts :eek:
however if you are 100% certain of your abilities and can satisfy scheme providers expectations then you will be fine :rolleyes:

Agree Flukey lol
I did say i did notify LABC and as i have all dead test results for them thats them sorted ! will just change it again regarding address/date its been a right pain ive had 2 places postpone the jobs now im doing my own garage CU the LABC told me the assessment notifications are a massive pain in the rear for them as if you pass you can notify in normal way and if fail (you'd have to do something magger stupid to !) you can still go through them they would rather people went that route !
Its a right pain as its £140 for them but £1.70 when you pass the assessment ! :mad:
When you look at requirments it states notify LABC thats it ! not have completed notice. As long as you notify them and have letter your covered.
Regards
Kung.
P.s. plus onece ive passed then the later job notified to LABC i then go back to LABC and tell them its not going ahead now due to no funds etc and can i have my money back ! been told i will get a refund if this happens !
EAT MY SHORTS building control !
 
Last edited by a moderator:
Agree Flukey lol
I did say i did notify LABC and as i have all dead test results for them thats them sorted ! will just change it again regarding address/date its been a right pain ive had 2 places postpone the jobs now im doing my own garage CU the LABC told me the assessment notifications are a massive pain in the rear for them as if you pass you can notify in normal way and if fail (you'd have to do something magger stupid to !) you can still go through them they would rather people went that route !
Its a right pain as its £140 for them but £1.70 when you pass the assessment ! :mad:
When you look at requirments it states notify LABC thats it ! not have completed notice. As long as you notify them and have letter your covered.
Regards
Kung.
P.s. plus onece ive passed then the later job notified to LABC i then go back to LABC and tell them its not going ahead now due to no funds etc and can i have my money back ! been told i will get a refund if this happens !
EAT MY SHORTS building control !
i hope your garage is attached to your house because i did a detached garage rewire and tried to use it for nic assessment and was told i couldnt because the work wasnt notifiable :eek:
 
Thanks Flukey
Didnt know that, my garage is 10ft from the back of my house and in my garden thought i could. Better replace my main house CU who told you ? NICEIC ? Told LABC about it and they still took my £137.50 and noted it.
 
Last edited by a moderator:
Thanks Flukey
Didnt know that, my garage is 10ft from the back of my house and in my garden thought i could. Better replace my main house CU who told you ? NICEIC ? Told LABC about it and they still took my £137.50 and noted it.
nic only class the cable from the house to the garage as notifiable. anything inside is not :eek:
this was confirmed to me when i first booked my assessment in january this year so i had to show 2 other jobs
 
Pitty i only have 2 dbl sockets and 2 lights on garage cu ! dam ! dam you NICEIC i say !

nic only class the cable from the house to the garage as notifiable. anything inside is not :eek:
this was confirmed to me when i first booked my assessment in january this year so i had to show 2 other jobs

How does testing etc work then if you replace garage cu ? and if not notifiable is it a minor cert ? as cu ? plus if some person wanted power supplied to a detatched garage etc does this mean the only cert/testing is done on supply cable only and cu and circuits dont need testing/certing or do they class them as minor ? What a grey area m8 !:confused: think i need a chat with Tony cable from NICEIC first thing monday
Cheers
Kung.
 
Last edited by a moderator:
Pitty i only have 2 dbl sockets and 2 lights on garage cu ! dam ! dam you NICEIC i say !



How does testing etc work then if you replace garage cu ? and if not notifiable is it a minor cert ? as cu ? plus if some person wanted power supplied to a detatched garage etc does this mean the only cert/testing is done on supply cable only and cu and circuits dont teen testing/certing or do they class them as minor ? What a grey area m8 !:confused:
Cheers
Kung.
i know mate, another stupid rule. i would still notify the job, its just nic wont recognise it for assessment purposes :mad:
 
i know mate, another stupid rule. i would still notify the job, its just nic wont recognise it for assessment purposes :mad:
Dam if i was also a bricky i could throw in a few bricks and now its attached ! :D and also 2 wall lights and 2 more dbl sockets now i got 4 lights and a ringmain and dig a small ditch and put drainage in and a shower head and thats my shower circuit ! could have a cooker as well and this sounds great give me a break from the mrs and kids !
 
Last edited by a moderator:
With regards to the NICEIC assessment. A copy of both EAWR and DOC P must be provided. Can anyone tell me if these need to be in publication format or can they be downloaded copies??.
 

Reply to Niceic assessment info in the Business Related area at ElectriciansForums.net

News and Offers from Sponsors

  • Article
As the holiday season approaches, PCBWay is thrilled to announce their Christmas & New Year Promotions! Whether you’re an engineer or an...
Replies
0
Views
476
  • Article
Bloody Hell! Wishing you a speedy recovery and hope (if) anyone else involved is ok. Ivan
    • Friendly
    • Like
Replies
13
Views
955
  • Article
Join us at electronica 2024 in Munich! Since 1964, electronica has been the premier event for technology enthusiasts and industry professionals...
    • Like
Replies
0
Views
900

Similar threads

There's a tax advantage of starting sole trader and growing a business you eventually hit a limit where you can't earn much more. (Once you have...
Replies
2
Views
392
Niceic dont allow 3rd party QS sign offs, the main problem i found was building control notifications ,we actually paid the local authority the...
Replies
1
Views
450

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc

YOUR Unread Posts

This website was designed, optimised and is hosted by untold.media Operating under the name Untold Media since 2001.
Back
Top