I have got my domestic installer assessment on Tuesday and have been doing some work over the weekend for the guy to assess. It's 5 mins from my house as they request that the job be within 30 mins distance. Most other jobs I've done (that are adequate to be assess on) are over an hours drive away so this worked out ideal..
Anyway, they want to see either a CU change, a re-wire or a new circuit. I've installed a new outside circuit, fed from a new RCBO, feeding a single socket outlet, 2 switched lights and 1 PIR switched light.
Now that I have come to test and certificate it I'm now having second thoughts about this being enough for them to assess as the lighting side of the circuit is fed via a fused spur..
Am I correct in thinking that I would only fill out an EIC for the socket outlet and everything after the spur a minor works cert?
Or do I put both onto the EIC separately?
Panicking now, I've left this way too late!!