• Please use style selector to select BLUE AND WHITE. If you are not already on it. This notice will go once you're on the correct style.

NICEIC Certification Scheme niceic eic cert

I aint got me book to hand but I remember a few that I use - method 3 - clipped direct, method 6 - horizontal trunking run, method 7 - vertical trunking run. Also I do put 101 for T+E in insulation plus 6 or 7 if it runs in trunking.
 
So what about Table 4A2 Page 265?
know what your saying jason but i would still put a c ;)
unless all of your circuit is run as per the numeric method but i find that highly unlikely with switch drops etc, most will be clipped direct
 
Last edited:
I suppose if we were going to be exact, and there was the room, we would put both!

Clear as mud as usual:D:D
 
I suppose if we were going to be exact, and there was the room, we would put both!

Clear as mud as usual:D:D
you got it lol
think what ever way you look at it the old letter method is better as its not so definitive.
youve got more chance of your circuit being clipped direct than recording method 101 for your loops and 102 for your drops :eek:
 

OFFICIAL SPONSORS

Electrical Goods - Electrical Tools - Brand Names Electrician Courses Green Electrical Goods PCB Way Electrical Goods - Electrical Tools - Brand Names Pushfit Wire Connectors Electric Underfloor Heating Electrician Courses
These Official Forum Sponsors May Provide Discounts to Regular Forum Members - If you would like to sponsor us then CLICK HERE and post a thread with who you are, and we'll send you some stats etc
Back
Top